Skip to content

Recent projects

A cross-section of work from the last two years — residential renovations, new builds, commercial fit-outs and the leak investigations that saved clients from unnecessary demolition.

Queenslander ensuite, Paddington

Second-storey timber-framed ensuite over a living room. Compressed sheet substrate, full floor membrane with 150mm upturn and full-height shower walls.

Two-coat liquid membrane, flood tested 24 hours

Hobless walk-in shower, Bulimba

Existing screed removed and re-fallen to a linear drain, threshold detailed with reinforcing fabric and the whole base sealed to the door line.

Screed rebuild + membrane, 3 days on site

38-unit townhouse development, Springfield

Seventy-six wet areas waterproofed across a staged twelve-month programme with ITPs, hold points and per-unit photo documentation.

AS 3740 systems, certifier sign-off pack supplied

Leaking shower diagnosis, Mermaid Beach

Water staining two rooms away. Thermal imaging and controlled spray testing isolated a cracked puddle flange rather than the assumed grout failure.

Targeted repair, no full strip-out required

Laundry and butler pantry, North Lakes

Particleboard subfloor prepped and sealed, splash zones behind tub and machine, floor waste and tap penetrations reinforced before vinyl.

Single visit, room back in use next morning

Café kitchen and amenities, Fortitude Valley

Commercial kitchen floor, cool room threshold and staff amenities sealed overnight so the venue could keep trading through the fit-out.

After-hours works across four nights

Podium deck and planters, Southport

Trafficable external membrane to a residential podium with planter box tanking and drainage cell detailing before landscaping.

AS 4654 external system, 420m²

1970s bathroom re-seal, Toowoomba

Original bathroom with no membrane at all. Full strip-out by the builder, substrate rebuild, then a complete AS 3740 wet area system.

Compliance certificate issued to certifier

Strata insurance report, Cleveland

Moisture mapping across three adjoining units to identify a shared wall leak source, with a written report used to resolve the strata claim.

Report delivered within 24 hours

Documentation

Every job comes with a photo record

We photograph the substrate before priming, each membrane coat, all junction and penetration detailing, and the flood test result where one is carried out. That record is emailed with your compliance certificate and held on file for the life of the warranty — which matters enormously if a question ever comes up at sale, insurance claim or defects inspection.

Working on something similar?

Send through photos or plans and we will tell you which system suits the substrate and what it will cost.